Projects

From concept to completion: Discover our latest work.

Recent Projects

Explore a selection of our recent projects, showcasing the delivery of our services.

Gemini Generated Image 6aviiz6aviiz6avi

FUSE ENERGY

Multi-Megawatt Data Centre – North West

We completed a feasibility study for a multi-megawatt AI data centre co-located on an existing BESS site, to establish the minimum footprint and whether additional land was required. Our electrical scope covered the power and resilience strategy, including a DRUPS-based standby solution to combine UPS and generation in a reduced footprint, and integrating the existing BESS for peak shaving, tariff avoidance and ‘2N’ resilience. We also set out A&B segregation, diverse routing of critical services between sites, and the approach to load shedding and availability class.

Alongside this, we developed the BESS fire separation strategy, data hall planning for high-density liquid-cooled NVIDIA B300 racks, and the cooling plant requirements. We optimised the rack layout to exceed the client’s capacity target, assessed modular alternatives, and gave the client a clear land acquisition decision and a defined design programme into RIBA Stage 2.

image 2

BSC Construction group

New Build Housing – Borehamwood

We are currently completing a project for a new build development, delivering a design package for nine new-build homes and a standalone commercial unit. Our scope entails the full electrical design, integrating sustainable technologies such as Solar PV, Air Source Heat Pumps, and EV charging stations.

We’ve managed the critical DNO liaison and application process to ensure grid compliance and capacity. Beyond power, we are performing detailed lighting calculations and designing the fire alarm systems across the entire site, to ensure full regulatory compliance and a seamless transition from concept to construction.

image

gypfix interiors

New Build Apartments – Brentford

Electrical Distribution Design and Validation of a new build apartment block as part of the “The Brentford Project” in London. We liaised with the DNO to provide the necessary engineering documentation to enable the energisation of the premises.

Clients We Work With

ChatGPT Image Oct 8 2026 04 48 45 PM
Fuse Energy logo
ChatGPT Image Oct 8 2026 04 35 36 PM 2

Let’s Work Together

Reach out to begin creating the engineering solutions
that drive your project forward.